
Back to the blog »
The middle of it is the part to read. Before the move the task noted how the two pages answered, home and login, after the move it asked both again, and only with the updates completed and both answers matching did it report the site as upgraded. Had either gone wrong, the last line would begin with “Not upgraded”, the site would be back on shop-10 and the spare taken off again. Two pages are of course not a site. Forms, cron, the look of a page and whatever your site does for a living are yours to check, and a site which passed can still hide something only you would spot, which is what the spare is for.
One job still wants somebody technical, and it comes before any button shows: the newer platform has to exist in your account. For this run we built two with Composer, shop-10 with Drupal 10.6.23 and shop-11 with 11.4.14, and put Admin Toolbar and Pathauto on both, because the task will not offer a platform which lacks a module the site uses. Building a platform has that part, and a site bound for Drupal 11 should sit on 10.6 first, the route we tested, since a major release drops the old database updates.
Our Upgrade was queued at 21:49 by the server’s clock. Three rows did the work in the task list, named so that nobody has to guess (the copy, the copy switched off, the move), beside an Import and a Verify of the copy, and at 21:52 it was over. The site is tiny, nine megabytes with its database, so do not take our three minutes as a promise, the page itself tells you to expect about the time of two backups of your site. What the task wrote into its own log on the way says more than our summary of it would, so here it is.

The Upgrade row in the task list opens one page before anything happens, and it is worth reading in full once. It names where the site is now, offers the platforms which are ready, and then tells in order what will be done, how much disk it wants and what to know about timing, which comes down to picking a quiet hour, because what visitors and editors change while the task runs is not kept when it succeeds.

Authored and reviewed by Adam, co-founder and human.
Fact-checking and drafting: Claude Code on Fable 5.2.
Graphics: courtesy of ChatGPT Pro, designed by Fable and Adam.

We queued that one too, at 21:53, which no sane person would do a minute after a clean upgrade, but we wanted the return trip on record. Go back set the upgraded site aside under another name, switched off, gave the copy the site’s name again, and at 21:57 its last line said that the site “runs Drupal 10.6.23 on shop-10 again, as it was at 2026-11-25 21:50”, and that what was added to the upgraded site since “can still be copied from there”. So the flat tyre goes into the boot, not into the ditch!
After the trip two places on the site’s page matter. The Drupal updates line now says when the site was upgraded and where the way back is, how old that copy is and what it takes on disk (ours: 9.11 MB, two minutes old when we looked), “kept until you delete it”, and the task list has a new row, Go back.

From there on the panel does the reading. The site’s page carries a line called Drupal updates, and ours said that an upgrade was available onto shop-11, “core only, a major update”, named the libraries which would take a major step with it, and added that Drupal 10.6 still gets security fixes (until 9 December, that is). What kind of step it is comes from the two platforms’ composer.lock files, so a platform somebody named “new” proves nothing to it, and when a newer platform is there but not ready the same line says what is in the way.
Upgrading a site has the rest: every way a result line can begin, what happens when a reboot cuts an upgrade off, and how one line in a control file limits which upgrades a site accepts. And if your platform holds thirty such sites and not one? There is a task for that as well, it takes them one at a time and stops at the first which does not make it, so bring a quiet hour and more coffee!
The task is called Upgrade, it came with BOA-5.88.888, and it is the old Migrate with a few habits of a careful driver added. Before the site goes anywhere the task fits the spare, a copy of everything the site has, switched off. It does not hand the keys back until Drupal’s database updates have finished and the site’s home and login pages answer as they did before, and when either goes wrong it turns around by itself (when a check could not tell, the last line says so and leaves the looking to you). For the day after there is a second task called Go back.
Go back has its price, and the docs list it: everybody is logged out, the site is away for a few minutes (longer when it is large), and what was added since the copy stays behind on the one set aside. The Upgrade itself has no trial run, it goes straight for the live site, so for an upgrade which matters the old routine keeps one job: clone the site, move the clone to the new platform with Migrate and look at it first. Both tasks are there for the account’s main login only, and Migrate remains the tool for sites on Drupal 9 or older and for Backdrop ones.
On the evening of 25 November a small Drupal 10 site on a test server of ours moved to Drupal 11 in about three minutes, counted from the moment its Upgrade task was queued in the Ægir control panel until the task had ended, and a few minutes later a second task took it back to where it started. Neither trip needs a shell. We kept the pictures, because Drupal 10 is supported until 9 December and many people have the first of those two trips still ahead of them.






