Migrating Your Data from Drupal 7 to Drupal 10 using the Migrate API: Avoiding entity ID conflicts Migration How To

 

Migrating Your Data from Drupal 7 to Drupal 10

Migrating from Drupal 7 to Drupal 10 involves several steps and careful planning to ensure a smooth transition. This guide will walk you through the essential steps and considerations for successfully migrating your data.

Understanding the Migration Process

Migrating from Drupal 7 to Drupal 10 is not a direct upgrade but a complex migration process. Drupal 7 and Drupal 10 have significant differences in their architecture, including changes in the core APIs, module system, and theme layer. Therefore, migration involves exporting data from the Drupal 7 site and importing it into the new Drupal 10 site using the Migrate API and related modules.

Preparation

Backup Your Current Site

Before starting the migration process, ensure you have a complete backup of your Drupal 7 site, including the database and all site files. This allows you to restore the site if anything goes wrong during the migration.

Review and Audit Existing Site

Audit your existing Drupal 7 site to identify the following:

  • Content types, fields, and taxonomies.
  • Custom modules and themes.
  • Third-party modules and their Drupal 10 equivalents or alternatives.
  • Custom code and business logic.

Set Up a Development Environment

Set up a development environment where you can perform the migration process without affecting the live site. This environment should replicate the production environment as closely as possible.

Migration Tools and Modules

To migrate from Drupal 7 to Drupal 10, you’ll need the following tools and modules:

  • Drupal Migrate: The core migrate module included with Drupal 10.
  • Migrate Plus: Provides additional functionality and migration plugins.
  • Migrate Tools: Command-line tools for running and managing migrations.
  • Migrate Upgrade: Facilitates upgrading from older versions of Drupal.

Migration Steps

Install Drupal 10

Set up a fresh installation of Drupal 10 in your development environment. Ensure it is fully functional before proceeding with the migration.

Set Up Migration Modules

  1. Enable the core migrate module and the migrate_drupal module:

    shell

    drush en migrate migrate_drupal -y
  2. Install and enable Migrate Plus and Migrate Tools:

    shell

    composer require drupal/migrate_plus drupal/migrate_tools
    drush en migrate_plus migrate_tools -y
  3. Install and enable Migrate Upgrade:

    shell

    composer require drupal/migrate_upgrade
    drush en migrate_upgrade -y

Run the Migration

  1. Configure the migration settings. Create a migrate directory in your sites/default directory and place your migration configuration files there.
  2. Use Drush to generate the migration configuration:

    shell

    drush migrate:upgrade --legacy-db-url=mysql://db_user:db_password@localhost/db_name --legacy-root=/path/to/drupal7 --configure-only
  3. Review and adjust the generated migration configuration files as needed.
  4. Run the migration:

    shell

    drush migrate:import --group=upgrade

Post-Migration Tasks

After the migration is complete, perform the following tasks:

  • Rebuild the cache:

    shell

    drush cr
  • Review the migrated content and configurations to ensure everything is in place.
  • Recreate any custom functionality and business logic in Drupal 10.
  • Test and adjust the theme to ensure it works correctly with the new Drupal 10 site.

Testing and Validation

Thoroughly test the migrated site to identify any issues or discrepancies. Validate that all content, configurations, and functionality have been correctly migrated. Engage stakeholders to review the site and provide feedback.

Go Live

Once the migrated site has been thoroughly tested and validated, you can prepare for the go-live process. This involves:

  1. Scheduling the go-live date and time.
  2. Notifying users and stakeholders of any expected downtime.
  3. Performing a final backup of both the Drupal 7 and Drupal 10 sites.
  4. Switching the DNS to point to the new Drupal 10 site.

Post-Go-Live Considerations

After going live, monitor the site closely to ensure everything is functioning correctly. Address any issues that arise promptly. Plan for regular maintenance and updates to keep the site secure and up-to-date.

Conclusion

Migrating from Drupal 7 to Drupal 10 requires careful planning, preparation, and execution. By following the steps outlined in this guide, you can ensure a smooth and successful migration process. With Drupal 10, you’ll benefit from the latest features, improved performance, and enhanced security, positioning your site for future growth and success.

 

Similar Posts